How to run a retro & an estimation

A step-by-step guide to operating Votenir — your self-hosted sprint retrospective and estimation workspace for agile teams.

Illustrated walkthrough · Both flows

Votenir has two tools in one workspace. Sprint Retrospectives walk your team through a facilitated reflection in four phases, and Planning & Story Estimation runs live estimation around a shared table. You operate both as the Scrum Master. This guide covers each from start to finish.

Getting started

1 · Getting in

Open votenir.com and create your account. Votenir uses single sign-on, so there's no password to set.

1

Click “Get Started”, then choose a provider

On the landing page, hit Get Started (or Sign In to Account if you already have one). A secure sign-up dialog appears — pick GitHub, Google, or Microsoft and authenticate. You'll land in your workspace.

Figure 1 · The sign-up dialog — GitHub / Google / Microsoft
iNo password needed. Sign-on is handled by your chosen provider; Votenir never stores a password.
Home base

2 · The workspace dashboard

After signing in you land on the Retrospective tab. A pair of tabs at the top — Retrospective and Estimation — switch between your two homes: your retro boards and your saved estimation rooms.

2

Find your way around

Use the Retrospective / Estimation tabs to switch views. On Retrospective, existing boards appear as cards showing their current phase and card counts. The two buttons top-right are where everything begins: + New Board for a retro, New Estimation for an estimation session.

Votenir Beta
adiralglobal Scrum MasterOcean ▾
▦ Retrospective⬡ Estimation

Retrospective Boards

Create, manage, and review sprint assessments with your team
+ New Board⬡ New Estimation
+ Create New Board
Sprint 1
Phase: Creating
Good 0Bad 0Start 0Stop 0Action 0
17 Jun 2026 · 0 cardsOpen ›
Sprint 0 Retro
Phase: Discussing
Good 5Bad 3Start 2Stop 1Action 4
10 Jun 2026 · 15 cardsOpen ›
Figure 2 · The dashboard with the top navigation bar and board cards
1Top bar — your workspace name, Scrum Master role, account avatar, the How to link, and the “Ocean” theme switcher.
2Retrospective / Estimation tabs — switch between your retro boards and your saved estimation rooms.
3+ New Board / New Estimation — start either flow here.
4Board cards — each shows live phase and per-column card counts; click Open › to enter.
Sprint Retrospective

3 · Create a retro board

3

Name it and create

Click + New Board. Give it a name (e.g. “Sprint 25 Retro”) and create. Every board starts with five ready-made columns — Good, Bad, Things to Start, Things to Stop, and Action — so you can dive straight in.

Figure 3 · The Create Retro Board dialog previews the five default columns
Phase 1 of 4

4 · Creating — capture ideas privately

The board opens in the Creating phase. Everyone adds cards to the columns at the same time, but cards stay hidden from others until you reveal them — so no one anchors on the first idea.

4

Add cards, take the mood poll, then reveal

Click + Add Card in any column, type your thought, and press Enter. Invite the team by email up top, and have everyone tap the Sprint Mood poll. When ideas slow down, hit Reveal All Cards and advance to Grouping.

‹  Sprint 25 Retro  👁 Reveal All Cards
1 Creating 2 Grouping 3 Voting 4 Discussing
Good1
+ Add Card
🚫 Hidden from others
The new www redirect works flawlessly now
chetan.wa…👍 0
Bad0
+ Add Card
Start0
+ Add Card
Stop0
+ Add Card
Action0
+ Add Card
Sprint Mood
How are you feeling today?
😄Very Good
🙂Good
😐Ok
🙁Bad
😄 Very Good0 (0%)
🙂 Good0 (0%)
😐 Ok0 (0%)
🙁 Bad0 (0%)
Figure 4 · The Creating phase — five columns, a hidden card, the mood poll, and the phase stepper
1Phase stepper — shows where you are; the Scrum Master drives transitions left to right.
2“Hidden from others” — your cards stay private during Creating so the team isn't biased.
3Sprint Mood poll — a quick temperature check tallied live on the right.
4Reveal All Cards — flips everything face-up when you're ready to move on.
Phase 2 of 4

5 · Grouping — cluster the themes

5

Drag similar cards together

Once cards are revealed, the Scrum Master moves to Grouping. Adding is now closed — drag a card on top of another within a column to stack them into a group, then name each group. When the themes are clear, press Start Voting →.

‹  Sprint 25 Retro
✓ Creating2 Grouping3 Voting4 Discussing
Good3
🔒 Grouping — adding closed
Faster CI pipeline
Stable deploys ⌃ stacked
Bad2
🔒 adding closed
Start1
🔒 adding closed
Stop0
🔒 adding closed
Action0
🔒 adding closed
Start Voting →
Figure 5 · Grouping — drag to stack cards; card-adding is locked
iAdding is locked from here on, keeping the board stable while you organise and vote.
Phase 3 of 4

6 · Voting — surface what matters

6

Vote on the groups that matter most

In Voting, each person spends votes on the groups they care about most. A live counter (Done Voting 0/1) tracks who's finished; likes stay open as a lightweight “me too” signal. When everyone's done, advance to Discussing.

‹  Sprint 25 Retro
✓ Creating✓ Grouping3 Voting4 Discussing
🗳 Done Voting (0/1)
Good3
CI / deploy improvements
group · 2 cards🗳 4
Bad2
Flaky tests
group🗳 2
Start1
Stop0
Action0
Figure 6 · Voting — spend votes on groups; the Done-Voting counter tracks the room
iOnly groups are votable. Stack related cards in Grouping first so they can receive votes.
Phase 4 of 4

7 · Discussing — decide and assign actions

7

Talk through the top themes and capture action items

The final Discussing phase orders groups by votes so you tackle the biggest themes first. Capture concrete action items in the Action column, assign an owner to each, and export the final list when you wrap.

‹  Sprint 25 Retro
✓ Creating✓ Grouping✓ Voting4 Discussing
Top themes, ordered by votes ⬇ Export action items
Good3
CI / deploy improvements
🗳 4 votes
Bad2
Flaky tests
🗳 2 votes
Start1
Stop0
Action2
Quarantine flaky tests
@maria
Figure 7 · Discussing — themes ranked by votes, action items assigned and exportable
Planning & Estimation

8 · Start an estimation room

Switch flows: open the Estimation tab — or click New Estimation from the Retrospective tab — to open a live estimation table. The Estimation tab also lists every room you've created so you can reopen or remove one.

8

Name the room and pick a deck

Choose a card deck — Fibonacci, Modified Fibonacci, T-Shirt sizes, or Sequential (1–10) — then Create & Open. Guests can join with a simple share link; no signup required for them.

Figure 8 · New Estimation Room — choose a name and a card deck

Once created, the room is saved to your Estimation tab. Each card shows the deck it uses and how many stories you've estimated in it — click to jump back in, or use the trash icon to delete it.

▦ Retrospective⬡ Estimation

Estimations

Every Agile Poker room you've run — open one to revisit its estimated stories
+ New Estimation
Sprint 25 Backlog Estimation
Fibonacci
17 Jun 2026 · 6 storiesOpen ›
Roadmap Sizing
T-Shirt
11 Jun 2026 · 3 storiesOpen ›
Figure 8b · The Estimation tab lists every saved room with its deck and story count
Planning & Estimation

9 · Run the estimation session

9

Everyone picks a card, then reveal the average

Players sit around the octagonal table. Each person picks a card from the deck (their choice stays hidden). Share the link to invite others, then as owner press Reveal Cards — every seat flips and the table shows the average. Revealing a story saves it automatically. Revealed by accident? Press Hide Cards to undo — the cards flip back, that save is removed, and everyone can keep voting with their picks intact; revealing again re-saves with the latest votes. Use Reset Board for the next story. Every saved story is listed in the collapsible Saved estimations panel by the Share button, where the owner can delete any entry.

‹  Sprint 25 Backlog Estimation
Live⤢ Share

Estimation · Fibonacci deck

You own this room
8 AVERAGE 8
chetan.wagh…
Pick your card
1
2
3
5
8
13
21
?
👁 Reveal Cards↺ Reset Board
Figure 9 · The estimation room — octagonal table, the deck, and owner controls (here showing a revealed average of 8)
1Octagonal table — seats every player; the centre shows “Waiting for players…”, then the average once revealed.
2The deck — tap a card to cast your estimate; ? means “unsure”, means “break”.
3Owner controlsReveal Cards flips all seats and saves the story; once revealed it turns amber as Hide Cards to undo (votes kept, the save removed); Reset Board clears for the next story.
4Share + Live — invite guests by link (no signup) and watch picks arrive in real time.
5Saved estimations — the archive button by Share opens every saved story with its average and votes; the owner can delete any entry.
Good to know

10 · Tips & limits

Get the most out of Votenir

  • You drive the phases. As Scrum Master you control every transition — Creating → Grouping → Voting → Discussing — so the team moves together.
  • Group before you vote. Only groups are votable, so stack related cards during Grouping or single ideas can't collect votes.
  • Guests join free. Estimation rooms take up to 250 participants via a share link with no signup wall — ideal for external stakeholders.
  • Rooms and revealed stories are saved automatically. Every room you create stays on your Estimation tab, and each story you reveal is kept in its Saved estimations panel — both survive after the room empties; only the current round's live votes and presence are ephemeral. Owners can delete saved stories, or a whole room, anytime.
  • It's in beta. Live sessions run on a single instance; expect rough edges and share feedback.
Votenir Beta · Self-hosted live sessions · This guide recreates the interface for instructional purposes.